Walking and Cycling Draft Master Plan

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

The Walking and Cycling Master Plan was prepared for the Rural City of Murray Bridge to improve the walking and cycling access and amenity for residents, visitors and tourists between the Murray Bridge town site and the Murray River and linking to the key attractions in Murray Bridge. It provides a blueprint for connected footpath and bicycle networks between key locations within Murray Bridge.

It offers a staged infrastructure plan and walking and cycling initiatives to encourage all types of walking and cycling activity.

You can review the documents found in the document library to the right and provide your feedback in the survey below.

You are also invited to attend an open forum to be held in the Murray Bridge Town Hall on Wednesday 9 May, 2018. You are welcome to drop-in anytime between 10am and 6pm to view plans, present your views or ask any questions you may have.

Your views on the proposed Walking and Cycling Master Plan are important to The Rural City of Murray Bridge and submissions should be received by no later than 5:00pm on Friday 18 May 2018.

The Walking and Cycling Master Plan was prepared for the Rural City of Murray Bridge to improve the walking and cycling access and amenity for residents, visitors and tourists between the Murray Bridge town site and the Murray River and linking to the key attractions in Murray Bridge. It provides a blueprint for connected footpath and bicycle networks between key locations within Murray Bridge.

It offers a staged infrastructure plan and walking and cycling initiatives to encourage all types of walking and cycling activity.

You can review the documents found in the document library to the right and provide your feedback in the survey below.

You are also invited to attend an open forum to be held in the Murray Bridge Town Hall on Wednesday 9 May, 2018. You are welcome to drop-in anytime between 10am and 6pm to view plans, present your views or ask any questions you may have.

Your views on the proposed Walking and Cycling Master Plan are important to The Rural City of Murray Bridge and submissions should be received by no later than 5:00pm on Friday 18 May 2018.

Murray Bridge Walking and Cycling Draft Master Plan Survey

Consultation has concluded